Adsense

Pages

Monday, January 24, 2011

A bridge is not for the thousands of people suffering from dharamapasha







Bamboo puladara upura let through - aite gear bukata daraphara kaira kamipya ude. I was telling puladara bairaiya janada paira below! But one day the market eidara laigya daraiya saptaya. Saying that a eidara upura birija aiba, it is on - oyalai know. 'Sad face and a chest with a sigh on the bridge walking shakily back Karim Abdul bhatapara the farmers are said satordhba.
Sunamganj dharamapasa selabarasa Union mahisakhala - badasaganja market road bridge over the river because its uttarabira gramasanlagna manai bhatapara, palapara, uttarabira and Rangpur is not about the thousands of people over many years navigating bridge to the extreme suffering pohate. Adults and students over the komalamati khude schools - in the.
Eventually the charges, before the election of leaders committed to building a bridge from them to the vote. After crossing the Styx and the leaders do not remember it. The daily life of hundreds of five risk students catai carpeting bamboo bridge over the schools - in the. Moves towards the bridge over the dry season, but bamboo carpeting catai barsaya in different images. I only rely on ferry naukai. After waiting for hours at a time and one-hour ferry crossing to the other may be. Wintry wind howling and the clouds of the sky when the ferry boat was not a lot of baile. It is impossible to get people in trouble. Students often have to go to time out waiting for a boat can not go to school. A bridge will be built here, eventually it will demand long.
Badasaganja kindara gartenera sisusiksarthi Policy, jidana, minu, drawing, tusarasaha Many fear they are falling from the bridge crossing one hand over another is sanghabaddhabhabe. But they are very afraid.
Purchase rokeya uttarabira village housewife (30), the pool accidents can happen to them, and against almost every day for my child to come to school. If you leave the house again with phiri. The domestic operations are interrupted. '
The success of the village residents palapara Pal (30), and the soil to make it through the sale of domestic goods calai. Near the pool is way too aite kanadhe understand them. 'CA looks at the problem, he said.
Public high school students and high school girl, Maria badasaganja khanama, Buy Soma Purchase and the money, not for swimming because of fear of naukadubira rainy day, most of them are not going to school. The damage is extensive education.
More freedom. Noor Hossain, the independence of the scene has changed several times in 40 years. Building a bridge to someone else in the area of ​​development, but largely favor. He was immediately concerned about the need for parents to claim a higher authority.
Selabarasa Union Council (iupi) Chairman Md. Alauddin Shah, the bridge does not create lokajanai only five villages, the kiln in the more severe the pain and suffering pohacche 8-10 people in the village. The need to create a bridge. I said, with several of the engineers. '
The engineer (acting) Md. Nurul Alam Chowdhury, a senior authority in order to build a bridge in the initial documentation for the work already been completed.
The executive officer (iuenao) more. The prathamaaloke Babul mina, and bridges do not have people suffering pohacche for, at the very very sad. I am concerned with the authority to take appropriate initiatives.


 

Sample text

Sample Text

free counters

Sample Text

 
Blogger Templates